DONGFANG ELECTRIC CORPORATION DEC BAROTHA CONSTRUCTION, ATTOCK THROUGH PROJECT MANAGER versus ASSISTANT DIRECTOR, MINERAL DEVELOPMENT, ATTOCK
Section 54 Civil Procedure Code (V of 1908), Section 115 and O XXXIX, Rr 1, 2 Grant ad interim injunction The plaintiff was instructed to pay the value of minor minerals with the future cost of the mined minerals. Should also be submitted to the court. Do not deposit the money as agreed by the court which resulted in the dismissal of the claim by the trial court in connection with the submission of the cost of the mined minerals, which was made in the matters related to the grant or otherwise the discrimination order was violated. It was fatal to act or disobey a direction for this matter, which is pending before the court. In the present case, the pending case before the court is a temporary injunction against the plaintiff's failure to collect the value of the minor minerals. Can result. The trial court exercised its jurisdiction to the maximum, excluding the application for a waiver, while rejecting the trial court's failure to comply with the directive, the trial court was wrong and faced a misconception of the law. The impeachment order was set aside and the case filed by the plaintiff will be considered pending before the court and the trial court will decide the case on its merits. r \ n
Related judgments — Lahore High Court Lahore, 2009