Section 54 Civil Procedure Code (v. 1908), O XXXIX, RR 1, 2 and, Section 115 Electricity Act (IX of 1910), Sections 51 and 68 Telegraph Act (XIII of 1885), Section 10 suits permanently Applicant for approval of the subpoena For the purpose of supplying power from his tube well, the plaintiff sought the airline to apply for the plaintiff's permanent injunction and temporary order subpoena, the trial court and the appeals court Source was denied simultaneously. The plaintiff could have contacted the transformer directly with his property using the plaintiff's feet 50 feet of property, the defendant could not insist that he would save costs, if there were questions and questions in this case. The lines are drawn in the reviews. It was legally entitled to belong to it, not legally credible. Such aspect of the case was not taken into account by the courts below Ampagn. Ed's orders were set aside, however, if the defendant wanted a connection, he could only use the plaintiff's property to suffer the least damage, which was absolutely necessary and desirable for that purpose, Otherwise, no matter what the cost. May be required to line it yourself \ r \ n
Related judgments — Lahore High Court Lahore, 2010