MIAN MUHAMMAD SABIR versus MALIK MUHAMMAD SADIQ
Article 12 (2) (5) of the Constitution of Pakistan (1973), Article 185 Appeal for Extension of the Supreme Court Limitations Requirement of Time \ Means Delay of Delay Limitations Copy of the Order within the contemplation of Section 12 of the Act, 1908 Time required to obtain. This means that the only interval between the date of application for delivery of the copy and the date it is ready for delivery is between the time at which the copy was ready for delivery, and for the applicant to apply. The date on which one chooses is not a date, in the present case, a portion of the time for obtaining the copy appellant `failed to produce the matrix / receipt issued by the copying agency, in which the certified copy The date of preparation is shown, however, because no such date was indicated. If the petitioner has prepared the aforesaid affidavit and the copy is not ready on the date stated in the affidavit, the appellant could have sought asylum under Section 12 (5), the Limitation Act, 1908 Prayer. nciples Appellant was unable to adequately explain the exceptional delay of 8 months to 9 days within the parameters of the law, the appeal was dismissed by the Supreme Court and the order of approval was dropped. \ r \ n
Find a Lawyer Near You
Dealing with a matter like this? Connect with a verified advocate in your city — free on SJP Lawyers Directory.
🔍 Find a Lawyer
property advocates from Ghizer lawyer