WATER AND POWER DEVELOPMENT AUTHORITY versus WEST PAKISTAN DRILL WELL CONSULTING ENGINEERS & CONTRACTORS
Section 115, O IX, R 8 and O XVII, R 3 Constitution of Pakistan (1973), Article 185 (3) Arbitration application denied on the basis of exclusionary limitations excluded in default, trial decisions Order of the High Court to uphold, leave for appeal to be considered for consideration) conviction inter alia (i) that the request was within time; (ii) the original application to be restored under the inherent powers of the court. And the request for restitution should not be denied with a time limit. (iii) The mediation fee was submitted for reference only, it should comply with the order of the trial courts, and therefore the application should not have been dismissed. (iv) As this was a pending matter, the matter should have been settled under OXVII, R 3, CPC. (v) The respondent was also absent on the day that the original application was rejected by default, thus the maintenance did not cause prejudice by any party as far as QAs are not competent.
Find a Lawyer Near You
Dealing with a matter like this? Connect with a verified advocate in your city — free on SJP Lawyers Directory.
🔍 Find a Lawyer
solicitors from Baroute lawyer