S.M. ILYAS AND ANOTHER versus KARACHI BUILDING CONTROL AUTHORITY THROUGH CHIEF CONTROLLER OF BUILDINGS AND ANOTHER
Section 21A Civil Procedure Code (v. 1908), AX Exxon, RR 1 and 2 Interim Orders, a grant to interfere with the construction of the building was allegedly built on a road cut line. Roads listed in Schedule G of the relevant rules and regulations were not included in the case and the Master Plan for Future Road Extension was not notified to the Environment Committee for consultation with the relevant authority designated in a particular area for building control. had gone. Announce and notify any other road / street width and new alignment (not mentioned in Schedule G) which in this opinion is easy for traffic purposes to overcome such traffic widths. The objection to the objections should be made only as per the rules. According to Schedule G Serial No. 5 where the conditions under the law were not complied with, the plaintiffs could not be compelled to return the building line during construction.
Find a Lawyer Near You
Dealing with a matter like this? Connect with a verified advocate in your city — free on SJP Lawyers Directory.
🔍 Find a Lawyer
how to become a advocate from Bhimbar lawyer